What Is Gantt Chart Maker?
Gantt Chart Maker is a free online tool by TechnSols that turns a list of tasks with start and end dates into a Gantt chart, the horizontal bar timeline project managers have used for over a century. You type one task per line, with its dates and an optional progress percent, and the tool draws one bar per task on a shared date axis, so overlaps, gaps and the finish date are visible at a glance.
The idea is simple: time runs left to right, and each task is a bar whose left edge is its start date and whose right edge is its finish date. The Gantt chart history goes back to Henry Gantt in the 1910s, and the chart is still the standard way to show a schedule, because a list of dates hides what a picture shows at once: which tasks run together and which ones wait.
Most plans fail quietly because nobody can see the whole schedule. Dates sit in emails, in chat messages and in a spreadsheet nobody opens, so two tasks land on the same week and nobody notices until the week arrives. A Gantt chart puts every task on one timeline, and the Project Roadmap Builder tool shows the same plan as milestones when a team needs the big picture instead of the detail.
People use it to plan a website launch, a house renovation, a course, or a product release. It works on the dates you type, so it shows exactly the plan you entered, including a progress fill on each bar when you add a percent. It cannot check whether your dates are realistic, because only you know how long the work really takes, and it does not track working days or holidays.
How To Use Gantt Chart Maker?
Here is how to make a Gantt chart online in three quick steps. Using Gantt Chart Maker is simple. There is no software to install and no account to make. Start with your task list, one task per line with a name, a start date and an end date, and the tool does the rest. When this job is done, the Task Dependency Visualizer tool is the natural next step.
Step 1: List Your Tasks With Dates
Type one task per line in the box, in this shape: task name, then a start date, then an end date, separated by the | character. Add a progress percent at the end when you know it, such as Design homepage | 2026-11-02 | 2026-11-06 | 50. Use the YYYY-MM-DD date shape, because the tool reads dates exactly and will flag any line that does not match it.
Step 2: Draw The Chart
Press Draw Chart and the tool draws one bar per task on a shared date axis, in the order you listed them. Longer tasks get longer bars, and tasks that overlap sit on their own rows so the overlap is easy to see. If a line has a bad date or an end before its start, the tool says which line is wrong instead of drawing a broken chart, so you can fix it and draw again.
Step 3: Download The Chart
When the chart looks right, download it as SVG for a report or as PNG for a slide deck or a chat message. The SVG stays sharp at any size, which suits printed plans, while the PNG opens anywhere without special software. If two dates look wrong, the Date Difference Calculator tool checks the gap between them before you redraw the chart.
The whole job takes a few minutes for a small project. Start with the big phases, add the detail underneath, and redraw whenever a date moves, because a chart that is out of date is worse than no chart at all.
Why Gantt Chart Maker?
A list of dates tells you when things happen, but it never shows how the work fits together. Two tasks that need the same person in the same week look harmless in a list and impossible on a chart. This maker turns the list into a picture, so the clash is visible before the week arrives. When the picture is ready, the Project Status Dashboard tool tracks how the same tasks are going week by week.
The chart also makes the finish date honest. The longest chain of tasks that must run one after another decides when the project can end, and that chain is what the critical path method measures. A Gantt chart shows that chain as a row of bars that touch end to end, so a delay on any of them moves the finish date, and a delay anywhere else does not.
See Overlaps Before They Hurt
Two tasks that need the same person, the same room, or the same budget in the same week are easy to miss in a list and obvious on a chart, where their bars sit side by side on the same dates. Seeing the overlap early means you can move one task, add help, or cut scope while there is still time to choose, instead of finding out on the day both are due.
Show The Plan To Anyone
A chart needs no explanation. A client, a manager, or a new team member can read it in seconds: what happens, when it happens, and what is already done. That shared picture stops the same three questions coming up every week, because the answer is on the wall, in the slide deck, or in the chat, wherever you pasted the chart.
Track Progress At A Glance
A progress fill on each bar shows how far every task has come without opening a single status report. A bar that is half filled on its last day is behind, and a bar that is full early is ahead, so the chart doubles as a progress check. It keeps the conversation about what is actually done, not about what was planned.
What Can You Do With Gantt Chart Maker?
Gantt charts fit anywhere work has dates. These are the jobs this maker handles best.
Plan A Website Launch
List the design, build, test and launch tasks with their dates, and the chart shows whether testing really has a full week or only two days squeezed after the build slips. The Team Workload Planner tool checks whether the same people are booked on too many of those tasks at once, so the launch date survives contact with the team calendar.
Plan A Home Renovation
A renovation is a chain of trades that must arrive in order: demolition, wiring, plumbing, plaster, paint. Put each trade on the chart with its dates, and the gaps between them show where a late delivery pushes everything else. The chart also gives every trade a date they can plan around, instead of a phone call the night before.
Plan A Course Or A Term
A teacher or a student can map a term as tasks: lectures, assignments, revision and exams, each with a start and a finish. The Sprint Planning Board tool then runs the week by week work on a board, while the Gantt chart keeps the term dates in view, so a busy week is spotted before it arrives.
Quality And Settings
The chart is drawn from your dates exactly as typed, with no rounding and no hidden adjustments. Bar positions come from the real gap between dates, so a four day task is twice as long on the chart as a two day task, and the date labels at the top mark the first day, the middle and the last day of the plan. If the plan needs a fresh look after a change, the Project Retrospective Board tool captures what the last plan taught the team.
- One bar per task, placed on a shared date axis from your real dates.
- Progress fill on any bar when you add a percent to the task line.
- Bad dates and reversed dates flagged by line number, never drawn wrong.
- SVG download for reports and print, PNG download for slides and chat.
- Date labels on the first, middle and last day of the plan.
There are no settings to tune, because the chart follows your dates. Type the tasks, draw the chart, and check the bars against the dates you meant. If a bar looks wrong, the line that made it is the place to look.
How Gantt Chart Maker Works
The maker reads your lines in the browser, checks each date against the YYYY-MM-DD shape, and finds the earliest start and the latest finish across all tasks. That range becomes the axis, and each bar is placed by its share of the range. The Days Between Dates Calculator tool measures the same gaps the chart draws, entirely in the browser, so nothing you type ever leaves your device.
Two limits are worth knowing. The chart draws calendar days, not working days, so it does not skip weekends or holidays, and it does not move later tasks when an earlier one slips: it draws the plan you typed, not a new plan. If a date moves, change the line and draw the chart again, and the bars move with it.
Privacy
Your task list never leaves your device. The chart is drawn in your browser with JavaScript, so the tasks and dates are read, placed and reported on your own computer. Nothing is uploaded to a server, nothing is stored, and nothing is shared with anyone.
Because no account is needed, there is no name, email, or history tied to what you plan. Closing the tab ends the session, and the browser clears the input from memory. That is the same protection on every tool here: your work stays yours, and nothing about it is kept, shared, or sold.
Tips
A few habits make Gantt Chart Maker work smoother, whether you are planning one project or working through a whole portfolio.
- Start with phases, then add detail: five big bars first, then the tasks inside them.
- Keep task names short: long names are cut on the chart, so put the detail in your own list.
- Add progress percents weekly: a chart with old progress is worse than no progress at all.
- Redraw after every change: a moved date changes every bar after it.
- Download the SVG for print: it stays sharp at any size, unlike a screenshot.
When the chart is final, save the PNG with the project name and the date, so the next person who opens the folder knows which plan it is. If a deadline moves, the Countdown Calculator tool counts the days left, so the new date stays visible to everyone.
More Tools For The Same Job
These tools handle the same kinds of jobs: dates, time, and turning a list into something you can share.
- Date Difference Calculator: works out how many days sit between two dates when you plan a task.
- Days Between Dates Calculator: counts the days between a start date and a finish date.
- Countdown Calculator: counts down the days left until a project deadline.
- Time Duration Calculator: adds up the time a task or a phase will take.
- Time Zone Converter: converts meeting times when the team sits in different time zones.
- CSV to JSON Converter: turns a task list saved as CSV into JSON for another tool.
- JSON to CSV Converter: turns a JSON task list back into CSV for a spreadsheet.
- Markdown to HTML Converter: turns project notes written in Markdown into a web page.
- Text to PDF: turns a written project plan into a PDF to share.
FAQ
Common questions about using Gantt Chart Maker, answered plainly.
Is Gantt Chart Maker by TechnSols Free?
Yes, Gantt Chart Maker by TechnSols is completely free to use, with no account, no sign-up, and no usage limit. You can draw as many charts as you like, and every chart is made in your browser, so nothing you type is uploaded or stored anywhere.
What Date Format Does Gantt Chart Maker Use?
The maker reads dates in the YYYY-MM-DD shape, such as 2026-11-02 for 2 November 2026. Every date in a task line must use that shape, and the tool flags any line that does not, so a mistyped date never draws a wrong bar on the chart.
Can Gantt Chart Maker Show Progress On Each Task?
Yes, add a progress percent at the end of a task line, such as 50 for half done, and the bar gets a darker fill for the finished share. The percent is optional, so tasks without one simply draw as a plain bar with no fill.
How Many Tasks Can Gantt Chart Maker Draw?
There is no fixed task limit, and small projects with up to thirty tasks draw cleanly on one page. Very long lists still draw, but the chart grows tall, so for a huge plan it is better to split the work into phases and draw one chart per phase.
Does Gantt Chart Maker Work Without An Account?
Yes, the maker needs no account, no sign-up, and no install. Open the page, type the tasks, and draw the chart. Your task list stays in your own browser, and closing the tab clears it, because nothing is ever saved on a server.
Type the tasks, draw the chart, and share the picture. A plan everyone can see is a plan everyone can follow, and this maker turns a list of dates into that picture in minutes.